Challenges:
Many of the balustrades and handrails were intricate and to a very high standard. Highly polished stainless in combination with glass and painted steelwork required much skill and dedication, especially in the Ceremonial Chamber.
Our team manufactured and installed the temporary support structure for the concrete railway link bridge. This required serious planning and high skill to be able to assemble, and then dismantle after concreting, during a very short time frame to avoid disrupting the train schedule.